To search, type and hit enter.

Modulift beams integral to preserving unique Southampton heritage

Modulift beams integral to preserving unique Southampton heritage

Three Modulift spreader beams were used in a one-over-two configuration beneath the hook of a 350t capacity mobile crane to remove the historic Castle Way footbridge in Southampton, UK last month (September).

Lifting and height safety specialist TackleStore Ltd T/A SafetyLiftinGear.com supplied the beams—a MOD 70 and two MOD 12s—alongside slings and shackles. The company delivered the rigging equipment to King Lifting, who regularly work with SafetyLiftinGear.com, for use with the rental firm’s six-axle Terex Demag AC 350-6. R&W Group, a provider of civil engineering, traffic management, rail, environmental, and plant services, oversaw the overnight removal of the historic bridge, which weighed just over 12t.

“Obviously, when an overnight closure of a public highway is scheduled, it’s important that the rigging gear is provided in a timely fashion and it meets the requirements of the lift. Understanding the load and detailed planning are prerequisites to success in such circumstances,” said Karl Chapple, hire and sales manager at SafetyLiftinGear.com.

The MOD 70 was used at 12m (39 ft.) in length above the pair of shorter, 2m (6.5 ft.)-long MOD 12s, which were utilised at either end of the spreader at a 90-degree angle to the top beam. A MOD 70 offers up to 70t at 10.5m (33 ft.) and up to 14m (45 ft.) at a lower capacity, while a MOD 12 offers up to 12t at 4.75m (15 ft.) and up to 6.5m (21 ft.) at a lower capacity. SafetyLiftinGear.com provided 8m-long, 20t capacity and 3m-long, 5t capacity roundslings, which combined to attach the rig to the hook of the crane and wrap beneath the footbridge.

The unique bridge, which provides a link between part of the city’s historic walls for pedestrians, was successfully removed during a 10pm to 6am road closure. The structure was taken to Solent Protective Coatings (SPC) where remedial works will be carried out over an approximate five-week period before the same equipment will return to the site for an overnight window of the same duration to reinstall the footbridge.

Talking to local media, Councillor Jacqui Rayment, cabinet member for transport and public realm, said: “We are committed to protecting and promoting Southampton’s amazing and unique heritage. Once back in place, the newly refurbished Castle Way footbridge will showcase the walls and the city to residents and visitors alike for many more years to come. The work to remove [and replace] the footbridge…will take place overnight with as little disruption as possible.”

Chapple added that the Modulift equipment was sourced from SafetyLiftinGear.com stock and explained that one-over-two spreader beam systems are particularly commonplace when there is a need to create or lift from four pick points. Overnight reinstallation of the bridge is scheduled for 29 October.

A video of the project can be seen here: https://youtu.be/eXcW7cgDrsk

You may also like:

SP wins Product Award at Speedy Expo 2018

Straightpoint’s (SP) Bluetooth-enabled Radiolink plus load cell and accompanying HHP app were named Lifting Product of the Year at the largest ...

Record pressure vessels moved on Cometto MSPE

Italian engineering company Fagioli S.p.A. recently handled the transport of two huge vessels. It was the biggest project ever done within the ...

Hiab completes the acquisition of Effer cranes

Hiab, part of Cargotec, has completed the acquisition of Effer S.p.A. from CTE Group. Signing of the transaction was announced on 31 July 2018. ...

New Andover Trailers plant body for AH Plant Hire

Chester-based AH Plant Hire has taken delivery of a new bespoke-built Andover Trailers plant body, an upgrade for the company’s original Andover ...

Announcement

HeavyTorque White Logo

It is with regret, that the HeavyTorque team have decided to take a stand based on an industry-wide ‘blind eye’ to the waste in the magazine and periodicals business.

HeavyTorque (#15, July 2018) was the final issue to grace the shop shelves, both on the High Street and across the travel network. As part of our onward strategy to adapt, HeavyTorque will now be distributed exclusively through controlled circulation and available through printed subscription.

Please note, this change will only affect newsstand purchasers. There will be no change for our loyal print subscribers.

Why the newsstand change? Quite simply, we can no longer (in good conscience) participate in a distribution programme that creates such an inherent waste of our precious natural resources – and money.

For those of you who have enjoyed HeavyTorque from the newsstand, we sincerely appreciate your business – and we would hope that you’ve enjoyed the magazine enough to consider a direct subscription?

Single Issues

If you prefer to purchase individual issues (one at a time), you will still have the ability to do so, both online (via the website), or by calling our offices +44 (0) 1572 3450872. Orders for single issues received before the pre-publication deadline will be mailed along with the subscribers.

Current and Back Issues

Our website also caters for those looking to purchase back issues. To browse Back Issue availability, follow this link: https://www.heavytorque.co.uk/shop/

Annual Subscription (UK/Europe and Rest of the World)

Never miss a beat, and keep up with every issue of the magazine via an annual subscription. To purchase your annual subscription, please visit: https://www.heavytorque.co.uk/subscribe/

It remains our objective, philosophy, and goal to provide our readers with the best content available, together with stunning feature photography. We do hope you will continue to support our venture!