ALE has successfully installed a 14,000t offshore platform in the North Sea
ALE were contracted to perform the float-over ballasting during the SylWin Alpha platform installation. ALE provided all necessary equipment and designed bespoke control and monitoring systems to perform the float-over ballasting during installation. The Sylwin Alpha was transported by the ...